Image Sequencing how to "grade" the right sequence?
Submitted by StefanoG on Fri, 03/06/2020 - 15:49
Forums:
Hi!
I used Image sequencing in Moodle 3.5.3.
In In Activity completion configuration it’s only possible to select that "Student must receive a grade to complete activity". So if a student does not complete the right sequence he however get a grade.
Now students that does not complete the right sequence are able to acces to next activity but I want they can do only if after a right sequence.
So, If I want to eneable the access to next activity only when the student complete correctly the right sequence, how can I configure it?
Content types:
BV52
Fri, 03/06/2020 - 19:29
Permalink
Hi Stefan,I think it is best
Hi Stefan,
I think it is best to contact the developer of this content through his git repo.
-BV